Heron Power

California power electronics maker building Heron Link, a modular 5-megawatt solid-state transformer for data centers, solar and battery storage. Founded by former Tesla executive Drew Baglino.

Industry: Power electronics / solid-state transformers | Location: Scotts Valley, United States | Founded: 2024 | Total Funding: USD 238M

About Heron Power

Heron Power is a California-based power electronics company that designs and manufactures modular solid-state power conversion equipment for data centers, energy storage projects and electricity grids. The company is led by chief executive Drew Baglino, a former senior vice president of powertrain and energy at Tesla. Its main product is Heron Link, a modular 5-megawatt converter that connects directly to medium-voltage networks. According to the company, the system delivers about 98.6 percent DC-to-medium-voltage efficiency and is intended to let developers of storage, renewable and AI data center projects connect without a conventional line-frequency transformer. Coverage describes the product both as a solid-state transformer and as a power converter. Heron Power raised a Series A of between USD 38 million and USD 43 million in May 2025 (sources differ on the exact figure), led by Capricorn Investment Group's Technology Impact Fund. In February 2026 it announced a USD 140 million Series B, as reported by TechCrunch and Pulse 2.0. The round was co-led by Andreessen Horowitz's American Dynamism Fund and Breakthrough Energy Ventures, with participation from Capricorn, Energy Impact Partners, Gigascale Capital and Valor Atreides AI Fund. DatacenterDynamics puts total funding at about USD 183 million. Crusoe has also been described as a backer. The company later secured a USD 60 million credit facility from J.P. Morgan and TriplePoint Capital and added former Tesla chief financial officer Zach Kirkhorn to its board, according to Pulse 2.0. Proceeds are being used to move from engineering into volume production. Heron Power is converting a roughly 286,000-square-foot former distribution warehouse in Morgan Hill, California, into Heron Factory One, designed to produce up to 10,000 Heron Links a year, equal to more than 40 gigawatts of annual capacity. Reports say the plant will require more than USD 100 million in investment, add over 600 jobs and begin mass production in late 2027. On the commercial side, Heron has signed a pilot agreement with the German utility RWE that outlines a path to reserving at least 500 megawatts of annual capacity, subject to definitive purchase agreements, and a non-binding letter of intent with Crusoe to supply power conversion technology for the Stargate data center campus. The company says it has identified more than 40 gigawatts of customer interest. Sources differ on the founding year, with 2024 and 2025 both cited, and on whether the engineering base is in Scotts Valley or Santa Cruz. The company has no confirmed operations in the Gulf or wider Middle East.

Leadership

Related News & Coverage