Hassan Allam Utilities

Investment and development arm of Egypt's Hassan Allam Holding, established in 2017, developing renewable energy, water, logistics and social infrastructure; its HAU Energy unit develops solar and wind projects in Egypt.

Industry: Renewable energy and infrastructure development | Location: Egypt | Founded: 2017 | Total Funding: USD 70M

About Hassan Allam Utilities

Hassan Allam Utilities is the investment and development arm of Hassan Allam Holding, the Egyptian construction and engineering group. It was set up in 2017 and concentrates on sustainable infrastructure, primarily renewable energy, along with water, transportation and logistics, and social infrastructure. Its renewable energy development work is carried out through HAU Energy. The company's own news page lists a 60 MWp solar plant at Benban and a 5 MW solar plant at Sharm El Sheikh among its independent power projects. In November 2025 a consortium of Hassan Allam Utilities, the European Bank for Reconstruction and Development (EBRD) and Meridiam signed agreements with Infinity Power, the renewables platform jointly owned by the UAE's Masdar and Egypt's Infinity, covering a 200 MW solar plant at Benban with 120 MWh of connected battery storage, targeted for commercial operation in the third quarter of 2026, and a 1,000 MW solar plant in Minya with 600 MWh of storage. Hassan Allam Utilities and Infinity Power have also signed a 25-year power purchase agreement with the Egyptian Electricity Transmission Company for a 1 GW wind project at Ras Shokeir in the Gulf of Suez. On 6 July 2026 the Emerging Africa and Asia Infrastructure Fund (EAAIF), managed by Ninety One, announced a USD 30 million senior secured corporate loan to Hassan Allam Utilities. The loan mainly supports the Minya project, which pairs 1,000 MW of solar generation with a 660 MWh battery energy storage system, and which one report described as among the larger solar and storage developments in Africa. Sources differ on the project's specifications: Infinity Power lists it as 1,200 MWp of solar with 600 MWh of storage, and EBRD documentation uses a different project name. A trade report described EAAIF as the sole lender with a primary claim on the transaction. The battery allows surplus midday output to be stored and released at peak demand. The July loan follows an earlier relationship with the same fund. In late 2024 EAAIF provided a USD 40 million project development facility to Hassan Allam Utilities to support the development of 2.3 GW of wind and solar projects in Egypt, including the Suez wind project. Company and press material describe a portfolio of 2.3 GW under development, scheduled to begin commercial operation in phases between the third quarter of 2026 and the third quarter of 2027, with total investment of about USD 2 billion, and a further pipeline of 1.65 GW comprising 350 MW of solar and 1.3 GW of wind with anticipated investment of about USD 1.5 billion. The company's website cites a much larger pipeline of more than 10 GW, which appears to measure a broader set of opportunities. Egyptian developers such as Hassan Allam Utilities work alongside and compete with Gulf groups including ACWA Power and Masdar in the region's renewable build-out.

Leadership

  • Dalia Wahba, Chief Executive Officer
  • Amr Allam, Chairman, Hassan Allam Utilities; Group Co-Chief Executive Officer, Hassan Allam Holding

Related News & Coverage